Lake Dallas Alerts

◄ Back
September 17, 2019 1:35 PM

Overly Drive Closure

The Atmos Line F gas line project will be working on Overly Drive this week in order to replace their main gas line. There should be one lane of access at all times during construction. The expected duration of the traffic disturbance is 7-10 days. Please follow all posted signage.

Facebook Twitter Email